Renovating a hotel without ever disturbing its guests.

Boutique hotels, palaces, suites and shared areas: Krapted manages hospitality projects floor by floor, often in occupied premises. Every key handed over matches the previous one, from the flooring to the final light switch.

Hotel corridor with soft beige mineral curves
Vaulted corridor with wooden and marble screens
Key figures

Hotel in operation

disruption contained, guests undisturbed

The property stays open: isolated zones, contained noise and dust, guest comfort preserved throughout the works.

Floor by floor

in occupied premises

Operations continue during the works: areas are isolated, disruption is contained, clientele is preserved.

1 standard

constant across all keys

On a repeatable programme, the last room handed over must be identical to the first.

Challenges

The hotel remains in operation throughout the works.

A palace never closes. The works take place in a venue that continues to welcome guests.

Hotel renovation is an exercise in phasing: rooms are handled floor by floor, common areas by zone, and disruption is contained to the hours when guests are sleeping or out. On top of this logistics comes an uncommon demand for consistency: across 40, 80 or 120 keys, the level of finish must not drift between the first room and the last, sometimes handed over a year apart. The project is therefore won twice: first in the model room, then in the repetition.

Guestrooms, spas, shared areas: the same exacting attention to detail.

Hammam in veined white marble
Vaulted corridor with light-wood screen
Marble bathtub with veining, soft lighting
Travertine shower with curved walls
Marble vanity with veining, gold-finished tapware
Savoir-faire

What a hotel project requires.

Four disciplines dedicated to hospitality projects.

01

Mock-up room and rehearsal

Everything begins with a model room: materials, layouts, joinery details and fittings are finalized there with the client and the architect. It becomes the visual contract for the project. The following floors are delivered identically, checked room by room against the same matrix.

02

Phasing in occupied premises

Floors under renovation are kept separate from those in service: dedicated access for trades, reserved service lifts, controlled time slots for noisy works, carefully designed signage for guests. Each week, hotel management receives a schedule of upcoming disruptions.

03

Bathrooms and utilities

The bathroom concentrates half the challenges of a guestroom: waterproofing, marble work, tapware, ventilation, and the reworking of pipe risers that are sometimes a century old. Vertical networks are handled in advance, so that a floor in operation above or below is never put on hold.

04

Shared spaces in full view of your clients

Lobby, bar, spa, restaurant: public areas are refurbished in full view. Hoardings designed like display windows, night-time works, deliveries outside guest arrival times. The project enhances the hotel’s image instead of diminishing it.